Installation
|
|
|
Check
the concrete floor, should for dry and level. |
|
|
Lay
plastic sheet on to protect moisture from the concrete |
|
|
Lay
subfloor (10 - 15 mm plywood) on the whole floor or lay the sticker
(1" thick and 2" wide) on with the space of 30 cm. |
|
|
Lay
Proket FJL on the subfloor or stickers and nail at the tongue through
subfloor or sticker. |